Difference between revisions of "Batanes News"

Jump to navigation Jump to search
→ → Go back HOME to Zamboanga: the Portal to the Philippines.
1,246 bytes added ,  12:25, 3 January 2012
no edit summary
Line 12: Line 12:
</table></div>
</table></div>
<!--- DO NOT EDIT ABOVE THIS LINE --->
<!--- DO NOT EDIT ABOVE THIS LINE --->
==DPWH reports completed infra projects in Batanes==
*Source: http://pia.gov.ph/?m=7&r=r02&id=70760
*By: Necitas G. Alconis
*''January 03, 2012''
BASCO, Batanes- About six infrastructure projects in the province are now 100 percent complete, according to the report from the office of the Department of Public Works and Highways (DPWH) Batanes District Engineering Office.
The projects include the Itbayat water supply system, repair of Itbayat Central School, repair of Raele elementary school, completion of Chabtucan-Chanarian Tukon farm-to market road (FMR), Brgy. Kayhuvokan, Basco day care multi purpose building, cementing of FMR Desin-vadishi in Mahatao phase 1, and rehabilitation of Ivana Elementary School.
Based on the agency report, 23 infra projects are on-going, three of these are nearing completion such as Road Protective Structure Guard Wall in Tukon Basco, upgrading of national road Itbayat airport-Mauyen port road, and the construction of Dichu-Ramay FMR Phase 11, Mahatao.
Earlier, the DPWH also reported the completion of the construction of Basco water system Phase 6, upgrading of national road to airport, Itbayat, construction of Taytay-Vahangsien right of way in Basco and concreting of FMR phase 1 in Uyugan.
==Batanes PDRRMC to be more proactive in 2012, says Batanes Gov.==
==Batanes PDRRMC to be more proactive in 2012, says Batanes Gov.==
*Source: http://pia.gov.ph/?m=7&r=r02&id=70604
*Source: http://pia.gov.ph/?m=7&r=r02&id=70604
43,102

edits

Navigation menu