File:Magat dam isabela province.jpg

From Philippines
Jump to navigation Jump to search
→ → Go back HOME to Zamboanga: the Portal to the Philippines.

Magat_dam_isabela_province.jpg(468 × 351 pixels, file size: 39 KB, MIME type: image/jpeg)

Magat Dam Isabela

  • Height: 114 metres (374 ft)
  • Crest Length: 4,160 metres (13,650 ft)
  • Volume of Rocks & Earth Materials: 18 million cubic meters
  • Concrete = 1.00 million cubic meters

The Magat Dam is located on the Magat River at the boundary between the municipalities of Alfonso Lista in the province of Ifugao and Ramon in Isabela both on the island of Luzon, approximately 350 kilometres (220 mi) north of Metro Manila. The Magat River is the largest tributary of the Cagayan River, the longest river in the country.

The construction and appurtenant structures was authorized by P.D. 693 signed on May 7, 1975 by the late President Ferdinand E. Marcos. The Magat Dam was constructed in 1978 and inaugurated by the Late Pres. Ferdinand E. Marcos on October 27, 1982 and started operations in 1983.

Implementation of this multipurpose project was based on the preliminary study conducted in 1973 by the National Irrigation Administration (NIA) with the assistance of the United States Bureau of Reclamation (USBR) and the United States Agency for International Development (USAID).

Subsequent detailed and extensive dam site investigation and engineering studies further confirmed the feasibility of what is now known as NIA's most daring infrastructure project and one of Asia's biggest dams today.

It was Southeast Asia's first large multipurpose dam. The dam is part of the Magat River Multipurpose Project (MRMP) which was financed by the World Bank and whose purpose is to improve on the existing Magat River Irrigation System (MARIS) and to triple the production of rice in the Cagayan River basin.

The project was jointly financed by the Philippine Government and the World Bank which extended a US$150M loan to finance the foreign exchange requirement. In addition, a US$9M loan from Bahrain was obtained for the purchase of other equipment for the diversion tunnels, soils laboratory and model testing. The total project cost is US$3.4B (yr. 1975). (source verbatim from: wikipedia)

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current16:14, 21 June 2011Thumbnail for version as of 16:14, 21 June 2011468 × 351 (39 KB)Maletsky (talk | contribs)*Isabela Province, Philippines image source: wn.com/Gamu,Isabela