ARMM completes rehab of PHP12.3-M Ramain Bridge

From Philippines
Revision as of 04:20, 17 February 2016 by Prdims (talk | contribs) (Created page with "*Source:http://www.pna.gov.ph/index.php?nid=2&rid=857564 *Tuesday, February 16, 2016 :(PNA), FFC/TPGJR/HIROHITO D. CADION MARAWI CITY, Lanao del Sur, Feb. 16 (PNA) -– Gove...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
→ → Go back HOME to Zamboanga: the Portal to the Philippines.
(PNA), FFC/TPGJR/HIROHITO D. CADION

MARAWI CITY, Lanao del Sur, Feb. 16 (PNA) -– Governor Mujiv Hataman of the Autonomous Region in Muslim Mindanao (ARMM) and Gov. Mamintal Adiong Jr. on Monday led the inauguration of the newly-repaired Ramain Bridge linking this province’ first district to this city.

Adiong said the repair of the Ramain Bridge provides an easy access to the residents in the first district to this city and to the other parts of this province.

Adiong noted that previously the residents had to take a longer route since the bridge was dilapidated.

The bridge, which was constructed in 1969, is located in the town of Ditasan-Ramain and lies within the provincial circumferential road.

Engineer Ote Macabando, who supervised the rehabilitation of the bridge, said the project cost the regional government PHP12.3 million.

The bridge has a total length of 61.36 meters and a width of 7.32 meters.

Hataman said the rehabilitation of the bridge forms part of the commitment of President Benigno Simeon Aquino III to bring progress to ARMM in general and Lanao del Sur in particular.