Difference between revisions of "Zamboanga City Water Reservoir Dam"

From Philippines
Jump to navigation Jump to search
→ → Go back HOME to Zamboanga: the Portal to the Philippines.
Line 4: Line 4:
At the source of the Tumaga river which is only about 5 kilometers from the barangay of Pasonanca, the river can be dammed. It is naturally bordered by hills and mountains from 200 to 400 meters high.
At the source of the Tumaga river which is only about 5 kilometers from the barangay of Pasonanca, the river can be dammed. It is naturally bordered by hills and mountains from 200 to 400 meters high.


By doing this the [[Zamboanga City, Philippines|City of Zamboanga]] will never ever suffer from water shortages. There will be enough water supply even for the farmers. This man-made lake may even be used for recreational purposes.
By doing this the [[Zamboanga City, Philippines|City of Zamboanga]] will never ever suffer from water shortages. There will be enough water supply even for the farmers. I have lived in Tumaga for over 60 years and this river never ran dry. The old folks much older than I am, attest to this same fact. This man-made lake may even be used for recreational purposes.


There is also a possible second benefit. That is electricity from turbines installed.
There is also a possible second benefit. That is electricity from turbines installed.

Revision as of 23:13, 9 April 2015

Creating a Reservoir by building a Dam

  • By: Franklin H. Maletsky, founder of zamboanga.com
January 5, 2000

At the source of the Tumaga river which is only about 5 kilometers from the barangay of Pasonanca, the river can be dammed. It is naturally bordered by hills and mountains from 200 to 400 meters high.

By doing this the City of Zamboanga will never ever suffer from water shortages. There will be enough water supply even for the farmers. I have lived in Tumaga for over 60 years and this river never ran dry. The old folks much older than I am, attest to this same fact. This man-made lake may even be used for recreational purposes.

There is also a possible second benefit. That is electricity from turbines installed.

If there is pro-active planning for this construction turbines for generators can be planned into the construction of the dam. There will be enough electricity generated from these turbines to provide ample electricity for the entire City of Zamboanga (from Limpapa to Licomo).

If the city does not have the budget for this project, I am absolutely positive that private investors will be lined up to put up the dam. This will give Zamboanga City ample supply of water and electricity.

Imagine that! No more black outs and no more water rationing.

This is the proposed area of the Reservoir. Mt. Culumbato (Pulumbato) will be located to the right of the Dam. It is a natural border. The area of the reservoir (LAKE) will be approximately 4 square kilometers. That is a good sized lake that can conserve all the water during the rainy season. No more flooding incidents. No more water rationing. No more blackouts.

Zamboanga City Reservoir.png

  • Google Map of the proposed reservoir area: