Difference between revisions of "Sorsogon Province, Philippines"

→ → Go back HOME to Zamboanga: the Portal to the Philippines.
Line 193: Line 193:


==[[Sorsogon News]]==
==[[Sorsogon News]]==
'''3 river control projects construction underway in Sorsogon'''
'''Gov’t inaugurates Spanish-backed peace & dev’t projects in Sorsogon'''
*Source: http://pia.gov.ph/news/index.php?menu=2&webregion=R05&article=791330384980
*Source: http://opapp.gov.ph/news/gov%E2%80%99t-inaugurates-spanish-backed-peace-dev%E2%80%99t-projects-sorsogon
*Tuesday 28th of February 2012
*Friday, 2 March, 2012 - 13:07
:by  Irma A. Guhit
:by  opapp.gov.ph/news




SORSOGON CITY, Feb. 28 (PIA) -- The Department of Public Works and Highways (DPWH) first district engineering office in Sorsogon has since been working on the completion of three river control systems in this city and Casiguran town to ensure the projects will be ready in time for the rainy season to mitigate effects of heavy flooding along river banks and neighboring areas.
Gubat, Sorsogon, March 2 - Several infrastructure projects that aim to boost peace and development conditions in the province were launched recently in Gubat and Barcelona towns, under the Sorsogon Initiatives Project, a joint effort of the Office of the Presidential Adviser on the Peace Process (OPAPP) and the Department of Interior and Local Government-Local Government Agency (DILG-LGA).
 
DPWH I District Engineer Romeo D. Doloiras said that the non-stop rains have caused rivers in some areas in the province of Sorsogon to swell and overflow and the lack of river control structures continues to endanger lives of people living near river banks.
The completed projects, funded by the Agencia Espanola de Cooperacion Internacional para el Desarollo (AECID), were symbolically turned over to the beneficiaries through a simple program at the Sta. Ana Elementary School in Sta. Ana, Gubat, and at the Barcelona Development Cooperative (BADECO) Operation Center for Peace and Development in Poblacion, Barcelona.
 
The agency's projects, anchored on DPWH new thrust of the “Right Project, Right Cost, Right Quality,” has earmarked the right funding to construct these river controls so as to abate the effects of flooding and stop soil erosions that usually silt rice fields, flood low lying areas and pose danger to people living within the area.
Present during the turn-over were Sorsogon Congressman Deogracias Ramos, Jr., Barcelona Mayor Manuel Fortes, Jr., Gubat Vice Mayor Sixto Estareja, Office of the Presidential Adviser on the Peace Process (OPAPP) Assistant Secretary for Programs Howard Cafugauan, Agencia Española Cooperacion Internacional para el Desarollo (AECID) Deputy Coordinator General Norberto Gomez De Liaño, OPAPP Director Eileen Jose and Colonel Felix Castro, commander of the 903rd Brigade, among others.
 
Doloiras averred that construction is underway for the the Ponong River Control in Casiguran town with a total funding amounting to of P4,146,750 which construction started last Nov. 4, 2011 to be completed on May 22, 2012.
The Sorsogon Initiatives Project aims to empower local communities through enhancing participation in local governance, and involving them in the preparation and implementation of peace and development projects.
 
On-going in the same manner is the rehabilitation and upgrading of the Sta Cruz-Storom River Control, also in Casiguran, in the amount of P12,371,151.80 started last Nov. 4, 2011 and to be completed this May 22, 2012.
In Sta. Ana, Gubat, the newly-completed projects include the widening and concreting of road in Sitio Apgo; construction of 1.5-kilometer Sta. Ana access road from Barangay Beriran to Carriedo; rehabilitation and expansion of 1.5-km Sitio Puro communal irrigation system; and repair of Sta. Ana Elementary School building. Ongoing is the cassava production livelihood project that will also benefit women and youth in four other neighboring barangays.
 
Meanwhile, the construction of the Buhatan River Control here started last October 28, 2011 and has been completed last Feb 24, 2012 which costed P5,932,165.66.
Barcelona, on the other hand, has four finished projects which include banana production sustainable agri-based enterprise program; rehabilitation of the Layug communal irrigation system; community-based training for out-of-school youth; and construction of the BADECO Operation Center for Peace and Development. Ongoing is the expansion of existing marine reserve and fish sanctuary in Brgy. Macabari to cover Brgys. Layug and Bangate.
 
Doloiras said that these projects would not anymore worry people of their safety aside from under the regular infrastructure program of the DPWH this also falls under the preventive maintenance category program of their agency and as the complementation mechanism of their agency under the Disaster Risk Reduction Program.
Other efforts completed as of December last year are peace and conflict sensitivity training, human rights and peace education seminar-workshop, among others.
 
"Part of DPHW's mandate is to be highly effective and efficient so that it can provide quality infrastructure support to the National Development Goals as envisioned by President Benigno Simeon C.Aquino III," Doloiras explained. (MAL/IAG-PIA5 Sorsogon)
The inaugurated projects were undertaken through collaboration with the National Irrigation Association, Technical Education and Skills Development Authority, Municipal Agriculture Office, Municipal Social Welfare and Development Office and Municipal Planning and Development Office of the local government units. #


==Photo Gallery of Sorsogon, Philippines==
==Photo Gallery of Sorsogon, Philippines==