472,078
edits
LOG IN. UPLOAD PICTURES.
The Philippines has Zambo Mart to help propagate the Chavacano Language.
Line 4: | Line 4: | ||
*The Solution to the problem: | *The Solution to the problem: | ||
#Building Codes: | #Building Codes: | ||
##Apartments, condominiums, commercial buildings, subdivisions must have a septic system with leach lines. If leach lines are not possible then the septics must be drained to a common area for processing. The lines must never be drained into the sewer system of the city, unless the city | ##Apartments, condominiums, commercial buildings, subdivisions must have a septic system with leach lines. If leach lines are not possible then the septics must be drained to a common area for processing. The lines must never be drained into the sewer system of the city, unless the city has a sewer rehabilitation pond already in operation. | ||
##The contractors or developers must come up with a plan that addresses the problem of sewer and septic before the city/municipality can grant him/her the permit. | ##The contractors or developers must come up with a plan that addresses the problem of sewer and septic before the city/municipality can grant him/her the permit. | ||
##If the development is in an area where the city/municipality does not have a sewer system in line, the developers must come up with a plan that will include the creation of a receiving pond to treat the sewer and septic drainage. | ##If the development is in an area where the city/municipality does not have a sewer system in line, the developers must come up with a plan that will include the creation of a receiving pond to treat the sewer and septic drainage. |