Difference between revisions of "Tawi-Tawi News"

Jump to navigation Jump to search
→ → Go back HOME to Zamboanga: the Portal to the Philippines.
3,451 bytes added ,  15:03, 24 April 2012
Line 43: Line 43:
----
----
<!--- DO NOT EDIT ABOVE THIS LINE --->
<!--- DO NOT EDIT ABOVE THIS LINE --->
==Airphil plane engine emits smoke before take-off, passengers ordered to disembark==
*Source: http://www.zamboangatoday.ph/index.php/news/13-top-stories/9674-airphil-plane-engine-emits-smoke-before-take-off-passengers-ordered-to-disembark.html
*Tuesday, 24 April 2012 12:34
:by Nonong Santiago/Hader Glang
Hundreds of passengers bound for Manila, Davao, Jolo and Tawi-Tawi were stranded yesterday morning when a turbo-prop plane of the Air Philippines started emitting smoke in the middle of Runway 27 while it was about to depart for Sanga-Sanga Airport in Tawi-Tawi Province.
Civil Aviation Authority of the Philippines Manager Celso Bayabos disclosed that the plane was given the clearance for departure at 7 a.m.
when the pilots noticed smoke coming from the right engine of the propeller plane while it was already 300 meters away from Runway 27.
The pilots had to stop the plane in the middle of the runway and ordered the affected passengers to disembark the aircraft resulting to the delay of the 7:45 a.m. Philippine Airlines flight for Manila, Bayabos said.
According to Bayabos, the inbound flight of Cebu Pacific from Manila to Zamboanga was also diverted to Davao City Airport because of the
obstruction.
“Ang AirPhil bound for Sanga-Sanga Airport in Tawi-Tawi was given a clearance for take off at Runway 27, but rolling for take off mga around
300 meters away na sya beginning sa runway 27, biglang hininto ng piloto ang eroplano dahil nahalata na may diperensya ang right engine ng eroplano. Ang ibang flight ng PAL for Manila ay na-hold muna. Ang inbound flight of Cebu Pacific from Manila to Zamboanga was diverted to Davao City airport,” Bayabos said.
The airport manager said they had to borrow the tow bar of the Philippine Air Force to tow the plane out of the runway.
Bayabos said the airport was cleared for landing and departure at past 8 in the morning. A Norwegian, Einar Solheim said his flight was supposed to be at 7:45 a.m. but due to the incident, it was delayed.
Rossnelly said this is not good because they are supposed to go to the Norwegian Embassy to apply for a fiancée visa. Some passengers were also clearly upset with the delay.
There is no clear report yet as to what was the cause of the incident.
==Air Philippines flight to Tawi-Tawi aborted due to smoke from engine==
*Source: http://newsinfo.inquirer.net/181255/air-philippines-flight-to-tawi-tawi-aborted-due-to-smoke-from-engine
*10:34 am | Monday, April 23rd, 2012
:by  Julie Alipala
Philippine Daily Inquirer
ZAMBOANGA CITY, Philippines— An Air Philippines flight to Tawi-Tawi was aborted on Monday morning as smoke emitted from the right engine of the plane, an official said.
Celso Bayabos, manager of the Civil Aviation Authority of the Philippines in Zamboanga, said  the plane was about to take off  when pilots noticed  the  smoke prompting them to park and order  around 50 passengers to disembark  shortly after 7:00 in the morning.
“It’s not really fire, there was smoke. It’s good that pilots noticed it before they take off otherwise (it would be) another disaster,” Bayabos said.
Other flights supposedly about to land at Zamboanga City international airport like Cebu Pacific from Davao city and Manila were advised to redirect their flights back.
Fire marshalls and other airport personnel immediately towed the aircraft back to the taxi area to determine the actual cause of engine trouble.
==P2.8-B infra projects for roads, bridges in ARMM under way==
==P2.8-B infra projects for roads, bridges in ARMM under way==
*Source: http://businessmirror.com.ph/home/regions/26160-p28-b-infra-projects-for-roads-bridges-in-armm-under-way
*Source: http://businessmirror.com.ph/home/regions/26160-p28-b-infra-projects-for-roads-bridges-in-armm-under-way
Line 69: Line 128:


On the other hand, there are a total of eight ongoing projects in the province of Maguindanao, involving a total of 38 kilometers of roads and 20 linear meters of bridges. “We have updated [data on] the road networks in the ARMM. We now have a plan to fully restore the road networks there,” he said.
On the other hand, there are a total of eight ongoing projects in the province of Maguindanao, involving a total of 38 kilometers of roads and 20 linear meters of bridges. “We have updated [data on] the road networks in the ARMM. We now have a plan to fully restore the road networks there,” he said.


==Shipper questions hold order on bark shipment==
==Shipper questions hold order on bark shipment==

Navigation menu