Difference between revisions of "Tawi-Tawi News"

Jump to navigation Jump to search
→ → Go back HOME to Zamboanga: the Portal to the Philippines.
2,490 bytes added ,  13:33, 22 April 2012
Line 43: Line 43:
----
----
<!--- DO NOT EDIT ABOVE THIS LINE --->
<!--- DO NOT EDIT ABOVE THIS LINE --->
==P2.8-B infra projects for roads, bridges in ARMM under way==
*Source: http://businessmirror.com.ph/home/regions/26160-p28-b-infra-projects-for-roads-bridges-in-armm-under-way
*SUNDAY, 22 APRIL 2012 18:27
:by JONATHAN L. MAYUGA / REPORTER
PUBLIC Works Secretary Rogelio Singson said several infrastructure projects in the Autonomous Region in Muslim Mindanao (ARMM) are being implemented to boost economic development in the region.
Singson said 26 projects worth around P2.8 billion are in various stages of implementation. All in all, the projects involve 117 kilometers of national roads and 132 linear meters of bridges.
“I’ve just met with President Aquino and the governors of the ARMM provinces and ARMM Governor [Mujiv] Hataman.  We have reported the status of our program in ARMM,” Singson told reporters during the Communication and News Exchange (CNEX) forum at the Philippine Information Agency (PIA) office in Quezon City.
The projects, he said, are part of the “Transition Investment Support Program for ARMM” being implemented by the Aquino administration.  It has a total budget of P8.5 billion, P2.8 billion of which is for the repairs, rehabilitation and upgrading of major roads in the provinces of Basilan, Sulu, Tawi-Tawi, Lanao del Sur and Maguindanao.
According to Singson, a total of three projects in Basilan involving the upgrading of 13 kilometers of road and 36.9 linear meters of bridge are now ongoing.
In Sulu he said the DPWH will implement a total of five projects that will construct 15 kilometers of road. Four of the projects have started.
Meanwhile, there are two upgrading projects involving 13 kilometers of road in Tawi-Tawi.  “We are also looking at improving the water system in Tawi-Tawi,” he said.
In Lanao del Sur there are a total of eight projects.  Five projects have just been awarded to private contractors while three others “will be awarded very soon.”
The projects involve the rehabilitation and upgrading of 33 kilometers of road and 75 linear meters of bridges.
“In Lanao we are also looking at upgrading the Agos River to improve and add 60 megawatts of power in Mindanao,” the DPWH revealed.
On the other hand, there are a total of eight ongoing projects in the province of Maguindanao, involving a total of 38 kilometers of roads and 20 linear meters of bridges. “We have updated [data on] the road networks in the ARMM. We now have a plan to fully restore the road networks there,” he said.
==Shipper questions hold order on bark shipment==
==Shipper questions hold order on bark shipment==
*Source: http://newsinfo.inquirer.net/180283/shipper-questions-hold-order-on-bark-shipment
*Source: http://newsinfo.inquirer.net/180283/shipper-questions-hold-order-on-bark-shipment
Line 63: Line 99:
The shipment was consigned to Paul Bercina of barangay Paknaan, Mandaue City.
The shipment was consigned to Paul Bercina of barangay Paknaan, Mandaue City.
It was seized from a motor boat by Navy personnel on Thursday. Tanbark is used in the production of paint, beads and food coloring. Correspondent Rhea Ruth V. Rosell
It was seized from a motor boat by Navy personnel on Thursday. Tanbark is used in the production of paint, beads and food coloring. Correspondent Rhea Ruth V. Rosell


==Magnitude 4.4 strikes off Tawi-Tawi==
==Magnitude 4.4 strikes off Tawi-Tawi==

Navigation menu